Project update: We’ve just broken ground at an Early Learning Centre in Riversdale where we’re installing safe, compliant surfacing.
The stats:
- Total project size – 275 m2
- Existing surfacing has been removed
- 22m of Coil Drain installed to existing soak pits
- 4 holes excavated and concrete footings in progress for shade poles
- New compacted basecourse installed
- A 35mm Poured Rubber shockpad currently being laid
- 81m of timber edgings installed
Location: Funshine Early Learning Centre, Riversdale, Southland
Products to be installed:
- Pour’N’Play Bike Track
- Perma Play
- MulchSet
Find Out What It Might Cost