Numat were called in to do the safety surfacing for the newly developed Cornwall Park Playground in Hastings. The design for this playground was produced by playground design company Creo.
Inspired by the surrounding landscape, the playground has an oak leaves and acorns theme. This gave Numat the perfect opportunity to showcase Pour’n’Play’s design capabilities, creating a river with autumn coloured leaves flowing throughout the space.
This park was always a favourite spot for the local community and since its transformation, at the end of 2019, it’s now a leading destination playground for Hastings.
Products used:
Further Case Studies
View all case studiesFurther Case Studies
Wanaka’s Rotary Park
Wanaka, Otago
In 2021, Numat worked with the Queenstown Lakes District Council and playground design company, Creo, to upgrade Wanaka’s Rotary Park Playground. The surface design called for blues, greens, and greys to match the parks surroundings.
Further Case Studies
Whangarei Town Basin
Whangārei, Northland
The Whangarei District Council reopened the Town Basin playground in early 2021. The refurbished playground featured a colourful design incorporating a theme of time and tides.
Further Case Studies
Kopupaka Reserve Playground
Auckland, Westgate
Kopupaka Reserve playground in Westgate, Auckland was the 2021, New Zealand Parks Awards, Playground of the Year. The playground ‘wowed’ judges with its mission to prevent emissions and support local climate change, as well as its vibrant colour and edible plantings.
Further Case Studies
Queenstown Gardens Playground
Queenstown, Central Otago
Numat worked alongside Reset Urban Design and JFC Construction to deliver Queenstown’s first destination playground.